top of page
Qualitas logo mark

LEAD MONITORING & EXPOSURE ASSESSMENT

Employers need lead monitoring wherever employees may breathe lead dust or fume above half the legal limit. Exposure is common in battery manufacturing and recycling, smelting and foundries, scrap metal and demolition, paint removal, soldering and glazing. Lead enters the body mainly by breathing in dust or fume, or by swallowing it from contaminated hands, food or cigarettes.

Qualitas Occupational Consulting is registered with the Department of Employment and Labour (DEL) as an Approved Inspection Authority (AIA) for lead. We are also a SANAS-accredited ISO/IEC 17020 inspection body for this work. Our results show who belongs in the 12-monthly monitoring programme, who must be under medical surveillance and which controls to fix first.

Worker cutting steel with an angle grinder as sparks fly
Qualitas logo mark

WHY AIRBORNE LEAD NEEDS MEASURING

Lead builds up in the body over time and can damage the nervous system, kidneys, blood and reproductive health. It harms health long before symptoms appear, and blood lead results only show what has already been absorbed. Air monitoring shows where exposure comes from and whether extraction, wet methods, hygiene facilities and respiratory protection are working.

High exposure also costs the business. An employee whose blood lead stays above the removal level on a repeat test is certified unfit for work with lead. Each removal must be recorded and investigated. Women capable of procreation must be removed from lead work at a lower blood lead level, or when they fall pregnant.

Lead work falls under the Lead Regulations, 2001, which set these duties and intervals:

• Risk assessment (regulation 6): at least every 24 months. Review it immediately if controls stop working or work methods change. The regulations do not say who must do it, so use a competent person.
• Air monitoring (regulation 7): at least every 12 months wherever exposure is above 0,075 mg/m³, which is half the limit (0,05 mg/m³ for tetra-ethyl lead). It must be done by an approved lead inspection authority, or by a person it verifies every 12 months.
• Engineering controls (regulation 14(b)): local exhaust ventilation on lead processes must be examined and tested at least every 24 months. This must be done by an AIA approved for these tests, or a person it verifies.

Review these with your occupational health risk assessment under section 8(2)(d) of the Occupational Health and Safety Act, 1993, which has no fixed interval. Our free Compliance Gap Assessment shows which of these apply to your workplace and which are overdue.

Interior of a large industrial warehouse with overhead cranes
Qualitas logo mark

WHAT THE LEAD REGULATIONS, 2001 REQUIRE

Foundry workers in protective gear pouring molten metal
Qualitas logo mark

HOW WE CONDUCT LEAD MONITORING

Every survey is led by Christo de Wet, an occupational hygienist with 15 years of experience. He is registered with the Southern African Institute for Occupational Hygiene (SAIOH), ROH 0953. Our AIA registration is OH0253 - CI 072, and our SANAS accreditation number is OH0253.

Before the visit, we ask for a list of lead processes and exposed employees, and your previous monitoring reports.

On the day, we walk the site with you to identify lead sources, processes and exposed employees, and review extraction, hygiene facilities and respiratory protection. Employees wear personal air sampling pumps in the breathing zone during normal production. The samples go to an accredited laboratory for analysis.

Afterwards, we compare each result with the limit and the 0,075 mg/m³ trigger, and show where respirator zones are needed. Our AIA approval for lead also covers the regulation 14(b) tests, so our local exhaust ventilation survey can serve as your 24-month statutory test. On mines and quarries, we work on surface operations only, under the Mine Health and Safety Act, 1996. Christo can take the section 12(1) appointment for those operations.

    • Personal airborne lead results for each employee or group, against the limit and the 0,075 mg/m³ trigger
    • The employees who belong in the 12-monthly monitoring programme
    • Where respirator zones are needed
    • Laboratory certificates for every sample
    • A review of extraction, hygiene facilities and respiratory protection
    • Practical recommendations, starting with the tasks and controls to fix first
    • Results your occupational medicine practitioner can use to decide who needs medical surveillance

    What affects the quote: the time on site, the number of samples and travel. Time on site depends on the size of the site and the number of work areas or employee groups to cover. Each sample sent for laboratory analysis is priced as one item, including media and analysis. The quotation lists each service as its own line item.
Production line machinery inside a modern industrial plant
Qualitas logo mark

WHAT YOUR LEAD MONITORING REPORT INCLUDES

    How often must lead monitoring be done?
    At least every 12 months wherever exposure is above 0,075 mg/m³, half the limit for lead other than tetra-ethyl lead (regulation 7). The risk assessment that decides this is repeated at least every 24 months. Review it immediately after a change such as a new furnace, a switch from wet to dry cutting or a failed extraction fan.

    Who may carry out lead air monitoring?
    An approved lead inspection authority, or a person whose ability it verifies at least every 12 months. The verification covers your equipment and sampler, with one group sampled together (regulation 7(3)). Qualitas is a DEL AIA for lead.

    Is lead monitoring the same as blood lead testing?
    No. Air monitoring measures the lead employees breathe. Blood lead tests form part of medical surveillance by an occupational medicine practitioner (regulation 8(1)). This covers employees exposed above 0,15 mg/m³ (the limit for lead other than tetra-ethyl lead), anyone exposed to tetra-alkyl lead and anyone the practitioner certifies. Our air results largely decide who belongs on that list.

    What must we prepare before the survey?
    A list of lead processes and exposed employees, your previous monitoring reports and normal production on the day. Tell us about cleaning and maintenance tasks that involve lead. Inform your health and safety representative or committee beforehand, as regulation 7 requires.
Steel roof structure and production machinery in an industrial plant
Qualitas logo mark

FREQUENTLY ASKED QUESTIONS

Qualitas logo mark

REQUEST A QUOTE

Tell us where your site is, which processes involve lead and how many employees work with it. We are based in Pretoria, work in all nine provinces and quote travel upfront.

bottom of page